Example logbook entry for continued inspections of floats:
Maintenance performed on Diamond DA20-A1 Rotax 912F-3 engine S/N 4412XXX:· SB-912-065 R2 Periodic Inspection of float buoyancy complied with. Floats checked as per section 3.1 to 3.3 inclusive and found to be within specification. Next inspection due in 25hrs flight time or 60 days, whichever is less.
Engine ground run, all parameters normal and no leaks found. Pertinent details regarding the maintenance described above can be found under the above (your company) Ltd Work Order and has been performed in accordance with applicable standards of airworthiness:
Signature: ___________________________________Date: ____________License: _____________
Independent Inspection on the Engine control systems for correct assembly, locking and sense of operation:
Signature: _______________________________ Date: _______________________________
|
Example logbook entry for SB-912-067 (float replacement):
Maintenance performed on Diamond DA20-A1 Rotax 912F-3 engine S/N 4412XXX:· SB-912-065 R2 “Periodic Inspection of float buoyancy” superseded by SB-912-067 · SB-912-067 “Exchange of floats” complied with. Ending action for SB-912-065 R2.
Engine ground run, all parameters normal and no leaks found. Pertinent details regarding the maintenance described above can be found under the above (your company) Ltd Work Order and has been performed in accordance with applicable standards of airworthiness:
Signature: ___________________________________Date: ____________License: _____________
Independent Inspection on the Engine control systems for correct assembly, locking and sense of operation:
Signature: _______________________________ Date: _______________________________
|